特定生産緑地指定の手引き
国土交通省都市局
国土交通省 都市局 都市計画課・公園緑地・景観課
Urban Farm DB summary
MLIT's Urban Bureau guide (April 2026 edition) explains the Productive Green Zone and Special Productive Green Zone systems and the municipal designation procedure. Productive Green Zones require at least 500 m² of urbanization-area farmland (reducible to 300 m² by local ordinance); as of 31 December 2025, 52,955 zones covering 10,613 ha were designated nationwide. Special Productive Green Zone designation must occur before the 30-year mark from the original zoning notice; once designated, the earliest date an owner can request a buyout is deferred by 10 years, renewable repeatedly with owner consent. In the three major metropolitan areas, parcels not redesignated shift to residential-land property taxation via a phased relief schedule (0.2/0.4/0.6/0.8 of the tax base increase in years one through four).
Extracted facts
7 factsOnly numbers and their conditions are stored, as structured data — never the source's own sentences. Metric and condition names stay in English, as coded.
- 500 sqm
minimum area requirement(productive green zone)
Policy- region
- Japan
- note
- 条例により300㎡まで引下げ可
- 52,955 count
designated districts(productive green zone)
Policy- region
- Japan
- as of
- 2025-12-31
- 10,613 ha
designated area(productive green zone)
Policy- region
- Japan
- as of
- 2025-12-31
- 10 years
deferral period after designation(special productive green zone)
Policy- region
- Japan
- 30 years
designation deadline from notice(special productive green zone)
Policy- region
- Japan
- 0.2 ratio
tax transition relief rate year1(non special productive green zone)
Policy- region
- Japan
- note
- 三大都市圏特定市の激変緩和措置初年度
- 0.8 ratio
tax transition relief rate year4(non special productive green zone)
Policy- region
- Japan
- note
- 三大都市圏特定市の激変緩和措置4年目
Direction of conclusions
Each author conclusion is recorded only as a coded direction per topic. Read the original for the conclusion itself.
- Policy and governanceSupports
Columns citing this source
This source is cited by the columns below. This page records the connection before you continue to the external source.